Site Overlay

INVENTORY

CURRENT PRICING AND EQUIPMENT LISTS – JULY 2026

INFRASTRUCTURE MANDATE: ASSET PRICING & DEPLOYMENT SCHEDULE

The following list details the current industrial-grade assets available through Theron Energy and Theron H2O. These units are classified as Primary Power Assets, designed for 24/7/365 continuous operation, and are engineered to permanently eliminate grid dependency. Unlike conventional “standby” or “backup” generators—which are classified as depreciating liabilities—Theron systems represent a fixed-capital infrastructure investment supported by a 50-year performance guarantee. The pricing below reflects domestic American manufacturing standards and adheres to the IEEE engineering protocols required for immediate municipal, industrial, and data center deployment.

PERMANENT MAGNETIC ENERGY
error: Content is protected !!